China Railway Tunnel Bureau Group required a load test of 800T on their new building gantry crane. This is the second load testing project after the first 700T load testing.
DOOWIN engineered an 800T load testing rigging plan with the client’s technical lifting authority. Once approved, we transported our high-tonnage water-weight bags, shackles, slings, and load cells to the load testing site ahead of schedule to ensure the project was executed on time and within budget.
DOOWIN team with highly experienced and qualified engineers was mobilized to prepare all rigging works prior to executing the load test. In order to meet the schedule, DOOWIN team worked all night to fill the water.
Client: China Railway Tunnel Bureau Group
- Industry: High-speed Railway
- Location: Guangzhou, China
- Year: June 2023
Loading Test Video using DOOWIN water weight proof load bags